Setup, Compatibility & Care
For a successful installation, follow these technical requirements: 1. Install the profile at the base of the cladding assembly. 2. Cut a 30mm fillet from your fibre cement plank to sit behind or adjacent to the profile, ensuring the facade remains flush. 3. Maintain a consistent 10mm ventilation gap between the profile and any surrounding materials to ensure air can circulate behind the cladding. 4. For maintenance, periodically inspect the profile to ensure the 10mm gap remains clear of debris and that the profile remains securely fastened to the substrate.