Setup, Compatibility & Care
Setup Steps:
- Measure the length of the cladding run and trim the profile using a non-ferrous metal cutting blade.
- Cut a 30mm fillet strip from a spare fibre cement board to act as a leveling shim.
- Secure the fillet to the wall structure to establish the correct plane.
- Install the drip profile over the shim, ensuring the profile is level.
- Confirm a 10mm gap between the profile and any adjacent vertical surfaces to allow for proper airflow and drainage.
Compatibility:
This profile is specifically manufactured for use with standard-thickness fibre cement cladding systems. Always verify the panel thickness matches the profile design before permanent installation.
Care:
Clean the aluminium surface periodically with a mild detergent and soft cloth to remove dust and debris. Avoid using harsh chemicals or abrasive brushes that may damage the Agate Grey finish.