Setup, Compatibility & Care
These valves are compatible with standard 15mm pipework installations. Installation should be performed by a competent person, ensuring all joints are properly sealed using appropriate plumbing tape or compound to prevent leaks. To maintain the gold finish, clean the valves periodically with a soft, dry cloth. Avoid using abrasive sponges, harsh chemical cleaners, or acidic solutions, as these can strip or damage the gold plating over time. Regularly check the valve head for smooth operation and ensure the nut connections remain tight during your annual heating system maintenance.