Setup, Compatibility & Care
Installation of lead flashing requires adherence to specific guidelines to ensure optimal performance and to validate the warranty. It is recommended to consult the Calder Training Module or LSA guidelines for detailed installation procedures. The lead sheet is flexible and can be cut to size using appropriate tools. Compatibility is high with most traditional roofing materials, but specific junction details should be assessed by a qualified professional. After installation, it is essential to coat the lead sheet with patination oil. This protective layer helps to prevent the formation of white oxides (lead carbonate) and maintains the aesthetic appearance and integrity of the flashing. Regular visual inspection for any signs of damage or displacement is advisable, though significant maintenance is generally not required. Ensure proper safety equipment is used during cutting and installation.