Setup, Compatibility & Care
Setup:
- Ensure the surface area is clean and dry before application.
- Cut the lead sheet to the required size and shape using appropriate tools.
- Dress and boss the lead carefully to conform to the roof contours, minimizing laps and joints.
- Secure the lead in accordance with best roofing practices, often requiring no additional adhesives or fixings for standard applications.
- For detailed installation guidance on cover flashing and step flashing, refer to resources at http://www.calderlead.co.uk/downloads/ or the video guides at http://youtu.be/eS4CfS-K0PE and http://youtu.be/GBtvHif6bTE.
Compatibility:
Calder Industrial Code 5 Lead Flashing is compatible with most common roofing materials, including tiles, slate, and bitumen. It is designed for use in conjunction with traditional roofing systems.
Care:
- Patination Oil: After installation, all lead sheet must be coated with patination oil to prevent the formation of white oxide. This is a critical step for protecting the lead and ensuring its longevity.
- Cleaning: Generally, lead flashings require very little cleaning. If significant debris accumulates, it can be gently brushed away. Avoid abrasive cleaners.
- Inspection: Periodic visual inspection is recommended, although maintenance is minimal.