Setup, Compatibility & Care
To install these bolts, ensure your chainring and crank spider are clean and free of debris. Insert the 6mm nuts into the chainring standoffs from the backside. Align the chainring and install the 4mm bolts from the front. Always apply a thin layer of light grease to the threads before installation. Use a 4mm hex wrench and a 6mm hex wrench simultaneously to secure the connection. Do not exceed the maximum torque of 7-8 Nm, as excessive force can strip the aluminum threads. Periodically check the bolts after the first few rides to ensure they remain snug, especially after heavy use or vibrations.