Setup, Compatibility & Care
To install, slide the tubular insulation onto the pipe before soldering or connecting fittings. For pre-installed pipes, the foam can be slit longitudinally, placed around the pipe, and secured with appropriate Armaflex adhesive to ensure the seams remain airtight. Ensure the pipe surface is clean and dry before application. To maintain the insulation, periodically inspect the joints to ensure the protective seal is intact. If the material is exposed to direct UV rays, it should be coated with a protective paint or cladding to prevent long-term degradation of the elastomer structure.