Setup, Compatibility & Care
Proper installation begins with a solid foundation. Ensure the ground is excavated to the appropriate depth, followed by a compacted sub-base of MOT Type 1 aggregate. A laying course of sharp sand should be screeded to ensure the blocks are perfectly level.
Maintenance Tips:
- Sweep regularly to prevent debris buildup in joints.
- Use a stiff broom to brush kiln-dried sand into joints annually to maintain structural integrity.
- For heavy stains, use a mild soap solution and a soft-bristled brush; avoid high-pressure washing at close range, as it may dislodge the jointing sand.