Setup, Compatibility & Care
Installation of the Galeco system requires standard hand tools, including a drill, level, and a hacksaw for custom-cutting the 3-meter lengths to fit your specific roofline.
- Measure the fascia length and mark the placement for the 20 provided brackets, ensuring a slight slope toward the outlet for efficient drainage.
- Secure the fascia brackets and snap the 3m gutter sections into place using the union brackets to connect joints.
- Install the stopends at the terminal ends of the run.
- Insert the balloon leaf guard into the outlet to finalize the system.
To maintain the system, inspect the brackets annually for tightness and clear the balloon guard of debris twice a year to ensure consistent flow.