Setup, Compatibility & Care
Installation requires a methodical approach to ensure long-term performance.
- Pipe Preparation: Cut the pipe to the desired length and ensure the end is properly chamfered using a file or specialized tool; a square cut with a rough edge will damage the internal seal.
- Cleaning: Ensure both the pipe end and the socket are free of debris or grit.
- Lubrication: Apply a high-quality silicon lubricant to the pipe end before pushing it into the socket. This ensures the pipe seats squarely and prevents the seal from 'rolling' or becoming pinched during assembly.
- Thermal Allowance: When inserting pipes into the ring seal socket, pull the pipe back approximately 10mm to allow for thermal expansion during temperature fluctuations.
- Maintenance: Periodically check clips to ensure they remain secure and inspect joints for signs of leaks after heavy periods of use.