Setup, Compatibility & Care
For proper installation, secure the board using two 65mm polytop nails at every rafter. It is essential to maintain a maximum spacing of 600mm between rafters to prevent the board from bowing or failing under the weight of water-filled guttering. Ensure that your nails are driven straight to avoid damaging the board surface. For cleaning, use a soft cloth with a mild, non-abrasive detergent and water. Avoid using solvent-based cleaners or abrasive pads, as these can damage the finish. Periodically inspect the board for signs of movement or loose fasteners, especially after extreme weather events.