Setup, Compatibility & Care
To ensure a leak-free installation, start by measuring your trench depth to meet local building codes. Before inserting the pipe into any compression or barb fitting, always chamfer the end of the cut pipe. This simple step removes burrs and creates a lead-in angle that prevents the internal O-ring or seal of the fitting from tearing during installation. Once cut and chamfered, ensure the pipe is pushed fully into the fitting until it seats against the internal stop. For long-term care, keep the pipe away from sharp rocks during the backfilling process, placing it on a bed of sand or soil free of debris to prevent puncture or abrasion over time.