Setup, Compatibility & Care
Installation of the Ecoscape cladding system requires a properly prepared, level sub-frame, typically constructed from pressure-treated timber or aluminum battens. It is critical to ensure proper ventilation behind the boards to prevent moisture buildup.
Installation Steps
- Install the sub-frame at the required spacing intervals as specified by the building design.
- Fix the starter clips at the base of the project area.
- Secure the first board and use appropriate composite cladding screws to fix subsequent boards.
- Use matching edge trims to conceal exposed board ends for a professional look.
Care Instructions
To keep the cladding looking its best, periodic cleaning with a soft brush and warm soapy water is sufficient to remove dust or pollen. Avoid the use of high-pressure power washers, as they may damage the surface texture of the composite material.