Setup, Compatibility & Care
Installation Requirements:
- The ceiling opening must be exactly 63 x 22.5 inches. Always double-check your joist layout before cutting into the ceiling.
- Ensure you have at least 2.9m to 3.7m of vertical clearance.
Customization:
- If your ceiling height is on the lower end of the spectrum, the support legs can be carefully trimmed to ensure the ladder sits flush on the floor at the correct angle.
Care & Maintenance:
- Periodically inspect the hydraulic struts to ensure they remain free of dust and debris.
- Check all bolts and fasteners every six months to ensure they remain tight.
- Keep the hinges lubricated to maintain the quiet, smooth folding operation.