Setup, Compatibility & Care
To set up the H16 system, ensure your GSE mounting frame is properly leveled and securely anchored to the roof trusses. The mid clamp should be inserted into the designated track on the framing system between two modules. Tighten the bolt according to the torque specifications provided in your main GSE system manual to ensure the EPDM seal is compressed correctly for a watertight result. Care should be taken not to over-tighten, as this could damage the frame channel. Inspect the EPDM seals annually during roof maintenance to ensure no degradation has occurred due to UV exposure or extreme weather conditions.