Setup, Compatibility & Care
Setup
- Acclimatization: Allow the tiles to acclimatize in the room for 48 hours before installation.
- Surface Preparation: Ensure the surface is clean, dry, and free from any grease or loose particles. For newly painted surfaces, allow them to fully cure for 4 weeks.
- Measurement: Measure the area you intend to cover and order the appropriate quantity of tiles.
- Application: Peel off the backing paper and lightly mist the reverse side of the tile with water for easier repositioning. Apply the tile to the surface, ensuring proper alignment.
- Interlocking: The tiles feature an interlocking design for easy alignment and installation.
Compatibility
The d-c-fix Marble Tile is compatible with:
It is *not* recommended for shower cubicles or areas exposed to direct heat sources like gas hobs.
Care
- Cleaning: Wipe the surface with a damp cloth and mild household detergent.
- Sealant: In wet areas, seal the tile edges with clear or white silicone sealant.
- Avoid: Harsh abrasive chemicals.
- Spills: Clean stain-prone spills promptly, such as curry or oil.