Setup, Compatibility & Care
- Preparation: Identify the mortar course and remove any existing plaster or render to expose the masonry.
- Drilling: Drill holes horizontally into the mortar course, following the manufacturer's recommended spacing and diameter guidelines. Clean out any debris.
- Injection: Using the Dryzone applicator gun, inject the cream into the drilled holes until the mortar is saturated.
- Filling: After the cream has been applied, fill the holes and allow the cream to cure.
- Reinstatement: Apply new plaster or render to the walls.
Compatibility: Dryzone is compatible with most masonry walls. Always test on a small, inconspicuous area before applying to the entire wall.
Care: Ensure that any new plaster is suitable for damp conditions. Regularly inspect the treated walls for any signs of recurring damp and address them promptly.