Setup, Compatibility & Care
Setup
- Preparation: Ensure you have the necessary tools, including a drill, level, and appropriate wall fixings (screws and anchors).
- Marking: Use a level to mark the desired location on the wall.
- Drilling: Drill holes according to the wall-fixing instructions.
- Mounting: Align the coat rack with the drilled holes and secure it using the appropriate screws.
Compatibility
The Ferm Living Lager Coat Rack is compatible with various wall types. However, ensure you use the correct wall fixings for your specific wall material (e.g., drywall anchors for drywall).
Care
- Cleaning: Wipe the coat rack with a soft, damp cloth. Avoid using abrasive cleaners or harsh chemicals.
- Maintenance: Regularly check the screws to ensure they are securely fastened.