Weld On Lifting Lashing Point - 5 Ton

Best current price£22.50from B&Q
Best offers
Shopping.co.uk recommended and popular offers
B&Q£22.50Visit shop B&Q - Weld On Lifting Point 5 Ton Grade 80 (G80 5T Lashing Attachment Rigging Excavator)
Visit shop
Best current price£22.50from B&Q
Shopping.co.uk recommended and popular offers
B&Q£22.50Visit shop B&Q - Weld On Lifting Point 5 Ton Grade 80 (G80 5T Lashing Attachment Rigging Excavator)
Visit shop2 offers from £22.50
View price history by clicking the chart icon.
The SecureFix Direct Weld On Lifting Point (5 Ton) is an essential component for professionals requiring a permanent, high-strength attachment point for lifting or lashing heavy loads. Designed for industrial fabrication and heavy machinery, it offers a reliable 5-ton safe working load and robust Grade 80 steel construction, ensuring long-term safety and durability. A critical caveat for all users is that this product requires installation by a certified welder using specific preheating techniques, as improper attachment can lead to structural failure.
| Model Part Number | SFYASWLP5 |
|---|---|
| Brand | SecureFix Direct |
No. This product must be installed by a qualified person who is capable of performing high-integrity structural welding.
This means the hardware is designed to withstand forces up to four times its rated 5-ton capacity before structural failure occurs.
The test certificate is supplied via email following the purchase of the product.
Yes, provided it is properly protected against environmental corrosion and regularly inspected for wear.
You must follow industry-standard preheating procedures; do not use tack welding or short, thin runs.
Grind out the weld completely and perform a new, full-penetration weld according to approved preheating standards.
Clean the surface with a wire brush and apply a suitable industrial-grade primer or corrosion-resistant coating.
Verify that your shackle size is compatible with the 45.5mm internal dimensions and ensure there is no weld splatter obstruction.
Installation must be performed strictly by a qualified welding professional. Proper setup requires adherence to specific preheating procedures to avoid embrittlement or stress cracking in the base metal. Do not use tack welds or short thin runs, as these are insufficient for load-bearing requirements. Once welded, the point should be inspected regularly for signs of stress fractures, corrosion, or deformation. If the lifting point is damaged or shows signs of significant wear, it must be removed and replaced by a certified individual immediately. Always maintain your provided test certificate in a safe, accessible location for workplace audits.