Setup, Compatibility & Care
For optimal setup, ensure the wall substrate is level and flat, as bowing can prevent the two-part system from snapping together correctly. Measure the wall height accurately and cut the 3-meter bars using a fine-toothed saw to prevent splintering the PVC. When securing the base section, use appropriate fixings compatible with the substrate (e.g., masonry or stud wall). For cleaning and care, use mild, non-abrasive detergents and a soft cloth; avoid harsh solvents that could compromise the antimicrobial surface coating. Routine inspections should focus on ensuring the top cap remains fully seated to maintain the environmental seal.