Setup, Compatibility & Care
Installation requires a vertical steel column or a structurally reinforced concrete wall. Before mounting, ensure the surface can handle the combined load of the hoist, the arm, and the maximum weight capacity. Use heavy-duty anchor bolts suitable for the mounting surface type.
Care Instructions:
- Regularly inspect the steel joints for signs of stress or rust.
- Apply lubricant to the swivel hinge every six months to maintain smooth operation.
- Periodically check the mounting bolts to ensure they remain tightened to the manufacturer's torque specifications.
- Always verify the weight of the load before lifting; never exceed the rated 300 kg limit for the main arm or 150 kg for the extension.