Setup, Compatibility & Care
Setup: Ensure the subfloor is clean, dry, level, and smooth. Remove any old flooring, debris, or imperfections. Acclimatize the LVT tiles to the room's temperature for at least 48 hours before installation. Lay the tiles using the integrated click system, ensuring each tile locks securely into the adjacent one. Cut tiles as needed with a sharp utility knife or specialized LVT cutter.
Compatibility: This LVT can be installed over most existing hard, flat floor coverings, provided the subfloor beneath meets the preparation requirements. It is compatible with underfloor heating systems, provided the temperature does not exceed the manufacturer's recommended limit (typically 27°C / 80°F).
Care: Regular cleaning involves sweeping or vacuuming to remove dust and grit. For deeper cleaning, use a damp mop with a mild, pH-neutral floor cleaner. Avoid using abrasive cleaners, waxes, or polishes, as these can damage the surface. Wipe up spills immediately.