Setup, Compatibility & Care
Proper site preparation is mandatory for the Asgard Garrison Workshop. Before the arrival of the installation team, ensure you have a flat, solid base made of concrete or tarmac. Because the unit is heavy and designed to be bolted down for security, it cannot be placed directly onto grass or soft soil. During setup, the professional installation team will handle the assembly of the steel panels and the alignment of the locking mechanism. To maintain the unit, occasionally clear debris from the ventilation channels to ensure consistent airflow. The exterior steel panels are factory-finished and typically require only a simple wipe-down with a damp cloth to maintain their appearance and prevent the buildup of salt or grime.