Setup, Compatibility & Care
To ensure a successful installation, follow these best practices:
- Preparation: Ensure the pipe end is cut square and deburred. Any rough edges or surface scratches can lead to leaks under the compression ring.
- Installation: Slide the compression nut onto the pipe, followed by the olive. Insert the pipe into the fitting body until it bottoms out.
- Tightening: Tighten the nut by hand until firm, then use an adjustable wrench to turn it an additional half to three-quarters of a turn. Avoid over-tightening, as this can crush the olive and deform the pipe.
- Maintenance: Regularly inspect the joint for moisture or signs of corrosion. If a leak develops, do not simply tighten further; disassemble the joint, check the olive for distortion, and replace if necessary.