Setup, Compatibility & Care
Installation requires basic hand tools and a level to ensure the rail is perfectly horizontal. Before starting, confirm that your door thickness is between 1 3/8" and 1 3/4".
- Measure the opening to ensure the 6ft rail covers the necessary span.
- Secure the mounting brackets into structural studs or a solid header board to support the 150 lbs capacity.
- Attach the rollers to the top of your doors according to the included manual.
- Slide the doors onto the track and verify that they bypass each other without obstruction.
For maintenance, wipe the aluminum track periodically with a soft, dry cloth to remove dust. Avoid using abrasive cleaners that could scratch the finish. Check the roller screws annually to ensure they remain tightened.