Setup, Compatibility & Care
Proper setup starts with a perfectly level foundation, such as concrete, paving slabs, or a dedicated shed base kit, to prevent the tongue and groove panels from warping over time. Before assembly, verify that all modular panels are present and organize the hardware. We recommend a minimum of two people for the assembly process to safely handle the larger wall panels. To maintain the building's longevity, apply a high-quality wood preservative or treatment shortly after installation and repeat every 12-24 months. Regularly clear debris from the roof and ensure the area around the base is kept free of standing water to prevent moisture ingress at the bottom of the shiplap boards.