Setup, Compatibility & Care
Installation requires a level floor to ensure proper water runoff towards the waste outlet. Before beginning, ensure your plumbing rough-ins match the single-end drain placement.
- Assemble the included legs according to the manufacturer's diagram.
- Position the tub and use a spirit level to ensure the unit is perfectly horizontal.
- Secure the bath to the wall using recommended brackets to prevent movement.
- Connect the waste and overflow components, testing for leaks before tiling or sealing.
For ongoing care, use only mild, non-abrasive household cleaners and a soft cloth to maintain the finish. Avoid using harsh chemicals or scouring pads, as these can scratch the surface. Regularly check that the drain and waste are free from debris to prevent slow draining.