Setup, Compatibility & Care
Setup
- Preparation: Ensure the ground is level and compacted. Excavate to the required depth, accounting for the slab thickness and sub-base material.
- Sub-Base: Lay a sub-base of compacted MOT Type 1 or similar aggregate, typically 100-150mm thick.
- Bedding Layer: Create a bedding layer of sharp sand or mortar mix, approximately 25-50mm thick.
- Laying the Slabs: Carefully place the slabs onto the bedding layer, ensuring they are level and aligned. Use a spirit level and rubber mallet to adjust as needed.
- Jointing: Fill the joints between the slabs with jointing compound or mortar.
Compatibility
The Bradstone Textured Dark Grey Reconstituted Stone Paving Slab is compatible with various landscaping designs and materials. Ensure that the chosen materials, such as jointing compounds, are compatible with reconstituted stone.
Care
- Cleaning: Regularly sweep the slabs to remove debris. Use a mild detergent and water for more thorough cleaning.
- Sealing: Consider applying a sealant to protect against staining and weathering.
- Avoid Harsh Chemicals: Do not use harsh chemicals or abrasive cleaners.