Setup, Compatibility & Care
Installation is a straightforward process: mark your intended positions, push each end of the hoop roughly 12cm into the soil or garden bed, and ensure they are aligned. For cover installation, drape your chosen material over the arches and secure it using the provided clips at the apex of each hoop.
For maintenance, wipe the aluminium frames down with a damp cloth at the end of the season before storing them in a dry shed. Avoid using harsh chemicals on the aluminium surface. If you intend to use the hoops in very soft, tilled soil, you may want to pack the earth firmly around the insertion points to improve stability.