Setup, Compatibility & Care
Installation should be performed by a qualified heating engineer to ensure compatibility with your existing central heating system. Ensure that the wall is load-bearing, as vertical double panel radiators are heavy once filled with water.
- Check Pipe Centers: Verify the measurements of your current pipework to ensure the valves align correctly with the radiator inlets.
- Bleeding: Regularly bleed the radiator using a bleed key to remove air pockets that may hinder performance.
- Cleaning: Wipe down the elliptical tubes with a soft, slightly damp cloth. Avoid harsh chemicals or abrasive sponges, as these may scratch the black finish.
- Pressure: Ensure your central heating system is maintained at the manufacturer-recommended pressure levels.