Setup, Compatibility & Care
To ensure the longevity of your P5 flooring, acclimate the boards in the installation room for at least 48 hours prior to fitting. When installing, ensure all joists are level; if the base is uneven, the integrity of the tongue and groove joint may be compromised. Use high-quality wood glue (PVA) in the joints to secure the connection and prevent future movement. When cleaning, avoid harsh chemicals or excessive water; a vacuum or a slightly damp cloth is sufficient. Always verify that your joist spacing is compatible with 22mm board thickness to ensure structural compliance with local building regulations.