Setup, Compatibility & Care
Setup
- Preparation: Ensure the roof edge is clean, dry, and free of debris.
- Cutting: Measure and cut the A200 trim to the required length, using appropriate tools.
- Adhesive Application: Apply GRP trim adhesive to the back of the trim.
- Placement: Position the trim along the roof edge, ensuring it aligns with the gutter and the C1, C2, or C4 corner trims (if used).
- Bonding: Press firmly to ensure a secure bond.
- Finishing: Apply topcoat to seal the edges and protect the installation.
Compatibility
The A200 trim is designed to work with Cure It roofing systems, and C1, C2, and C4 corner trims.
Care
- Inspect the trim regularly for any signs of damage or wear.
- Clean the trim periodically to remove any debris that may impede water flow.
- Ensure gutters are clear and free of blockages to maintain proper drainage.