Setup, Compatibility & Care
Installation of the ProofVision charger should always be performed by a qualified electrician to ensure compliance with building regulations.
- Back Box Preparation: Ensure a 47mm deep dual gang back box is installed horizontally within the wall.
- Wiring: Connect the unit to the 220-240V mains supply following the included wiring diagram.
- Mounting: Secure the unit into the back box, ensuring the faceplate sits flush against the wall surface.
- Care: To maintain the finish, wipe the unit with a soft, dry cloth. Avoid using harsh chemical cleaners or abrasive sponges that could scratch the plastic surface. Periodically inspect the socket for debris to ensure clear access for toothbrush stems.