Setup, Compatibility & Care
Setup: Ensure the subfloor is clean, dry, and level before installation. Acclimatize the flooring in the room for at least 48 hours before laying. Start laying planks from the longest straight wall, following the click-lock system instructions to join planks end-to-end and side-to-side. Leave an expansion gap around the perimeter of the room.
Compatibility: This laminate is compatible with most standard subfloors. It is also designed to work effectively with most common underfloor heating systems. Ensure the heating system is turned off and cooled down before installation and follow specific manufacturer guidelines for both the flooring and heating system.
Care: Clean regularly using a vacuum cleaner with a soft brush attachment or a dry mop. For deeper cleaning, use a slightly damp mop or a cloth dampened with a recommended laminate floor cleaner. Avoid using excessive water, steam cleaners, or abrasive cleaning agents, as these can damage the surface and the locking mechanism.