Setup, Compatibility & Care
Setup is simple thanks to the integrated screw-lock connectors. To install, first connect your main starter cable to a GFCI-protected outlet. Then, attach the first 2m icicle string by aligning the pins, pushing the connectors together, and twisting the locking collar until tight. To maintain the life of your lights, periodically inspect the rubber cables for signs of rodent damage or abrasion. During periods of non-use, disconnect the strings from the power source and store them in a cool, dry place to prevent moisture buildup in the connectors. Avoid using harsh chemical cleaners; a soft, damp cloth is sufficient to remove dust or debris from the LED housings.