Setup, Compatibility & Care
Installation is straightforward but requires attention to alignment. Before pouring concrete, place the fibreboard strips along the planned joint lines. If the length of your project exceeds 2440mm, place the boards edge-to-edge with no gaps to maintain a continuous barrier.
For care and maintenance, ensure that the joint is properly sealed at the surface level with an appropriate joint sealant if the application requires a watertight finish. The boards themselves are designed to be permanent, so no specific removal or maintenance is required after the concrete has cured, provided they were installed flush with the desired surface level.