Setup, Compatibility & Care
Installation requires careful planning due to the weight of the product. Use a post-hole digger to create a hole at least 600mm deep. Ensure the bottom is filled with a small amount of hardcore for drainage before placing the post. Level the post in all directions and secure it using a high-quality post-mix concrete. Once the concrete has cured, panels can be slid into the slots. No ongoing maintenance is required, though you may periodically hose down the concrete to remove accumulated moss or dirt for aesthetic purposes.