Setup, Compatibility & Care
Installation requires basic hand tools including a hammer or nail gun and appropriate fixing nails. Follow these steps for best results:
- Ensure the fascia board is level and secure.
- Fix each 900mm length to the top of the fascia board at 300mm centres.
- Align the interlocking ends of each successive piece to maintain a continuous vent.
- Carefully lay the bottom edge of the roofing felt over the upward projection of the eaves guard to ensure water drains correctly into the gutter.
Regular inspection during gutter cleaning is recommended to ensure the bird comb remains clear of debris and that the ventilation slots are not obstructed by leaves or organic matter.