Setup, Compatibility & Care
Installation requires standard roofline framing. Ensure that the substrate is level before fixing the board. Use stainless steel fixings to prevent potential rust streaks or chemical reactions. For cleaning, periodically rinse the boards with water and a mild detergent solution to remove debris or bird droppings. Avoid using abrasive cleaning pads or strong solvents that could scratch or degrade the black factory-applied finish. When cutting the material to length, use a fine-toothed blade suitable for aluminium and smooth any rough edges with a metal file to ensure a clean finish at the joint points.