Schneider Oval Bread Proofing Basket - Brown

Best current price£24.38from UK Office Direct
Best offers
Shopping.co.uk recommended and popular offers
UK Office Direct£24.38Visit shop Schneider Oval Bread Proofing Basket Long 500g
Visit shop
Best current price£24.38from UK Office Direct
Shopping.co.uk recommended and popular offers
UK Office Direct£24.38Visit shop Schneider Oval Bread Proofing Basket Long 500g
Visit shop4 offers from £24.38 - £51.22
View price history by clicking the chart icon.
The Schneider Oval Bread Proofing Basket is an essential tool for home bakers looking to elevate their bread-making process by ensuring consistent dough structure and a professional appearance. It is designed to support the final proofing stage of artisan loaves, promoting uniform fermentation and creating a classic spiral pattern on the crust; however, users must be diligent about the specific dry-cleaning and heat-sanitizing maintenance requirements to prevent mold growth.
| Colour | Brown |
|---|---|
| Model Part Number | 201400 |
| Brand | Schneider |
No, do not use water to clean the basket. Excess moisture can encourage mold growth. Use a brush for cleaning and an oven for sanitizing.
You should sanitize the basket periodically, or whenever you notice significant flour buildup, by baking it in the oven at 120-140C for 20 minutes.
Ensure the basket is properly seasoned with a light coating of flour before each use, and consider an enzyme-free releasing agent for the very first use.
Yes, it is suitable for any dough that requires a final proofing stage, including sourdough, yeast-leavened artisan loaves, and rye breads.
The basket is safe for the oven only for the purpose of sanitization at the recommended temperatures (120-140C). It is not designed to be used for baking the bread inside.
Increase the amount of flour dusting before adding the dough and ensure the basket is completely dry.
Perform the oven sanitization process at 120-140C for 20 minutes to eliminate moisture and odors.
To ensure the longevity of your basket, follow these steps for preparation and ongoing maintenance: