Canya Wall Light - Black - IP44

Best current price£23.99from B&Q
Best offers
Shopping.co.uk recommended and popular offers
B&Q£23.99Visit shop B&Q - Canya Matte Black Ip44 Bathroom 2 Way Frosted Reeded Glass Wall Light
Visit shop
Best current price£23.99from B&Q
Shopping.co.uk recommended and popular offers
B&Q£23.99Visit shop B&Q - Canya Matte Black Ip44 Bathroom 2 Way Frosted Reeded Glass Wall Light
Visit shop7 offers from £23.99 - £35.00
View price history by clicking the chart icon.
This guide is for anyone looking to install or use the ValueLights Canya Wall Light in black. The key benefit is its ability to stylishly illuminate bathrooms, living rooms, bedrooms, and hallways with an IP44 rating for safety. Note that while the reeded glass shades provide a cozy atmosphere, the light output is diffused, so consider this when planning your lighting scheme.
| Colour | Black |
|---|---|
| Model Part Number | 5016529261452 |
| Brand | ValueLights |
IP44 rating means the light fixture is protected against solid objects larger than 1mm and splashing water from any direction, making it suitable for bathrooms.
Yes, you can use LED bulbs as long as they are the correct type and wattage for the fixture.
Turn off the power, remove the glass shade (if applicable), and unscrew the old bulb. Install the new bulb and reassemble the fixture.
The fixture has a matte black finish.
Installation should be performed by a qualified electrician.
Contact the seller to understand warranty options.
Check the circuit breaker and ensure it is switched on. Verify that the light bulb is properly installed and not burnt out.
Check the bulb and replace if needed. Ensure all wiring connections are secure and tight.
If the light is properly installed and IP44 rated, this shouldn't occur. If it does, contact a qualified electrician to inspect the fixture for damage.
Installation of the Canya Wall Light should be performed by a qualified electrician to ensure safety and compliance with local regulations. The light is compatible with standard household electrical systems. Always turn off the power at the circuit breaker before beginning any installation work.

*Example: Use a soft, dry cloth for cleaning.*