Setup, Compatibility & Care
- Preparation: Ensure the outer wall of the pipe and the inner wall of the fitting are clean and free from any debris.
- Application: Apply solvent cement evenly to both surfaces.
- Assembly: Immediately push the pipe fully into the fitting and give it a slight twist to ensure good contact.
- Cleaning: Remove any excess cement with a damp cloth.
- Setting: Allow the joint to set for 5 minutes before handling.
- Testing: Wait 12 hours before testing the installation for leaks.
*Compatibility: Only for PVC and ABS soil and waste pipes.*
*Care:* Store in a cool place, away from heat sources and out of reach of children. Always work in a well-ventilated area and avoid skin contact. If contact occurs, wash thoroughly with soap and water.