Setup, Compatibility & Care
Setup
- Surface Preparation: Ensure the surface is clean, dry, and free from loose particles. Any existing cracks or imperfections should be addressed before application.
- Priming: Apply the primer to the prepared surface, following the manufacturer's instructions.
- Membrane Application: Apply the Mapegum WPS liquid membrane evenly over the surface.
- Tape Application: Apply the waterproof tape to all corners and joints.
- Drying Time: Allow the membrane to dry completely before tiling (12-24 hours).
Compatibility
The kit is compatible with moisture-resistant plasterboard, gypsum plaster, cementitious render, and tile backer boards.
Care
No special care is required after the tiling is complete. Regular cleaning of the tiled surface with appropriate cleaning agents is recommended.