Setup, Compatibility & Care
Installation requires standard PVC cladding techniques, including the use of stainless steel nails to prevent rusting and staining of the boards. Ensure a consistent batten spacing—typically 400mm or 600mm depending on local building regulations—to support the boards properly and allow for thermal movement. For care, keep the surface clean by washing with warm, soapy water and a soft sponge. Avoid abrasive cleaners or solvents, as these can damage the Anthracite Grey embossed surface. Always ensure there is adequate ventilation behind the cladding system to prevent moisture buildup within the wall assembly.