Setup, Compatibility & Care
Installation should be performed by a qualified electrician to ensure all wiring meets local building regulations, specifically concerning the 30mA RCD requirement for Zone 1 installations.
Installation Steps:
- Ensure the main power is turned off at the consumer unit before beginning.
- Secure the mounting bracket to the ceiling using the provided accessories.
- Connect the earth, live, and neutral wires as per the instruction manual.
- Attach the fitting to the bracket and secure it tightly.
- Carefully insert the 3 x G9 clear capsule bulbs.
- Affix the crystal droplets to the specified points on the frame.
Care Instructions:
- Regularly dust the crystal droplets with a dry, lint-free cloth to maintain their clarity.
- Use a soft, slightly damp cloth for the chrome frame; avoid abrasive cleaners that could scratch the finish.
- Periodically check the mounting hardware to ensure the fitting remains secure.