Setup, Compatibility & Care
Installation must occur concurrently with the masonry work. Ensure the substrate is level before laying the mortar bed for the tray. The tray should be positioned to ensure the water-shedding surface is correctly oriented toward the external leaf.
- Compatibility: Compatible with standard masonry, including brick and block.
- Orientation: Ensure the unit is the correct 'Right Hand' piece for the intended gable slope.
- Maintenance: Once installed and enclosed in the wall, these units are maintenance-free as they are protected by the outer masonry skin.