Setup, Compatibility & Care
Setup
Setting up your Precision Pro Team Shelter is designed to be straightforward, requiring approximately 10 minutes with two people.
- Unpack Components: Lay out all frame pieces, the heavy-duty fabric, and ground pegs from the carry bag.
- Assemble the Frame: Connect the PVC plastic and steel frame pieces according to the instruction diagram. Ensure all connections are secure.
- Drape the Fabric: Carefully drape the heavy-duty waterproof fabric over the assembled frame. Align the fabric corners with the frame's structure.
- Secure the Fabric: Attach the fabric to the frame using any integrated loops or ties. This ensures a snug fit and prevents sagging.
- Anchor the Shelter: Use the provided ground pegs to firmly secure the shelter's base to the ground. This is crucial for stability, especially in windy conditions.
Compatibility
- Goal Conversion: The shelter's frame is specifically designed to match the dimensions of a standard 12' x 6' football goal. To convert it into a goal, you will need to purchase a compatible goal net and attachment clips separately.
- Accessories: Please note that the six-seater bench often associated with team shelters is not included and must be purchased independently.
Care & Maintenance
- Cleaning: Clean the heavy-duty waterproof fabric with a damp cloth and mild soap. Avoid harsh chemicals or abrasive cleaners that could damage the fabric's coating.
- Drying: Always ensure the fabric is completely dry before packing it away in the carry bag. Packing damp fabric can lead to mildew, odors, and fabric degradation.
- Storage: Store the shelter in its heavy-duty carry bag in a cool, dry place when not in use. Avoid storing it in direct sunlight for prolonged periods.
- Inspection: Periodically inspect all frame components, fabric, and pegs for any signs of wear, damage, or corrosion. Replace damaged parts as needed to maintain safety and functionality.