Setup, Compatibility & Care
Installation should be performed by a qualified heating engineer to ensure all 1/2 inch BSP connections are sealed correctly. Before installation, confirm that the wall material can support the weight of the double-panel unit. For ongoing care, simply wipe the gloss white surface with a soft, damp cloth. Avoid using abrasive sponges or harsh chemicals, as these may scratch the finish. Periodically check the valves to ensure no leaks are present at the connection points and bleed the radiator if you notice cold spots, which often indicate trapped air within the system.