PrimaPlus Solder Ring fittings are a premium copper fitting with integrated solder. No need to add...PrimaPlus Solder Ring fittings are a premium copper fitting with integrated solder. No need to add additional solder when installing, saving time. PrimaPlus Solder Ring can be used for a variety of installations including water and gas. Manufactured from copper to EN 1254 standard, and fully WRAS approved, you can be sure of a perfect fit each time. PrimaPlus fittings are also kite marked, ensuring that they are to the highest British standard, setting them apart from other manufacturers. Kite marked approval BS Standard. WRAS approved for use with drinking water. Manufactured to EN 1254 standard.
Best current price£1.27from Professional Building Supplies
The Primaflow Solder Ring Tee - 15mm is designed for plumbing professionals and DIY enthusiasts looking for a reliable and time-saving solution for connecting three sections of 15mm pipe. Its key benefit is the integrated solder, eliminating the need for additional flux and solder, which speeds up installation significantly. A potential caveat is that proper cleaning and preparation of the pipe ends are still crucial for a secure joint.
All features
Brand
Primaflow
Extended Product Information
FAQs
Do I need flux with these fittings?
No, flux is not required as the solder is integrated directly into the fitting.
What type of pipe can I use with these fittings?
These fittings are designed for use with standard 15mm copper pipes.
Are these fittings safe for drinking water?
Yes, the Primaflow Solder Ring Tee fittings are WRAS approved for use with potable (drinking) water.
Can these fittings be used for gas lines?
Yes, they are manufactured for use in both water and gas installations.
How long does the integrated solder last?
The integrated solder is designed to last indefinitely when stored correctly in a dry environment. It is protected within the fitting until heated.
What is the main advantage over traditional fittings?
The primary advantage is the significant time saving during installation, as there is no need to apply separate flux and solder.
What standards do these fittings meet?
They are manufactured to EN 1254 standard and have WRAS approval. They also carry Kite Mark approval, indicating they meet high British Standards.
Troubleshooting
Joint leaks after cooling
The joint was likely not heated sufficiently or evenly, or the pipe/fitting was not clean. Reheat the joint carefully and ensure solder flows completely around it. If the leak persists, the fitting may need to be cut out and replaced.
Solder not flowing
Ensure the fitting is adequately heated. The heat needs to transfer through the copper to melt the internal solder. Check that the pipe and fitting surfaces were clean before assembly. Insufficient heating is the most common cause.
Fitting cracked during heating
Excessive or localized heating can damage the copper. Ensure the heat source is moved evenly around the fitting during the soldering process. Use a moderate flame and avoid prolonged direct heating on one spot.
Integrated solder ring didn't melt
This indicates insufficient heat applied to the fitting. Ensure your heat source is adequate for the job and that you are heating the fitting body itself, not the pipe directly.
Pros and Cons
Pros
Saves significant installation time due to integrated solder.
Eliminates the need to purchase and handle separate solder and flux.
High-quality copper construction ensures longevity.
WRAS and Kite Mark approvals provide confidence in safety and compliance.
Suitable for both water and gas lines.
Cons
Requires careful heat application to ensure proper solder flow.
Initial cost may be higher than traditional copper fittings requiring separate solder.
Can be less forgiving of pipe imperfections compared to traditional methods if not prepared correctly.
Not suitable for applications requiring solderless connection methods.
Setup, Compatibility & Care Instructions
Setup:
Preparation: Ensure the ends of the 15mm copper pipes to be joined are clean, free from debris, and deburred using a pipe reamer or file.
Assembly: Slide the 15mm Solder Ring Tee onto one of the pipe ends. Ensure it is pushed fully home.
Alignment: Insert the second 15mm pipe into the other end of the tee fitting, again ensuring it is fully inserted.
Heating: Using a propane torch, heat the fitting evenly, focusing on the underside where the pipe enters. Avoid heating the pipe directly.
Soldering: As the fitting reaches the correct temperature, the integrated solder within the ring will melt and be drawn into the joint by capillary action. Continue heating briefly until the solder flows around the entire joint.
Cooling: Allow the joint to cool naturally without disturbing it. Do not attempt to move or stress the joint while it is cooling.
Compatibility:
Compatible with standard 15mm copper pipe.
Suitable for both water (hot and cold, including potable) and low-pressure gas installations.
Always confirm compatibility with specific gas regulations in your region.
Care:
These fittings require no specific maintenance after installation.
Store in a clean, dry environment to prevent corrosion or contamination before use.
Handle with care to avoid damage to the fitting or the integrated solder ring.